Gross Schaltschrankbau takes on defined manufacturing services for electrical assemblies and control cabinets based on documents provided by the customer or completed jointly. From a single work step to the tested end product, the result is a clearly defined scope of services that relieves internal capacity and fits into existing supply chains.
Basis
Customer documents and a defined approval status
Scope
Individual manufacturing steps or a complete assembly
Material
Customer-supplied, procured by us or a mixed model
Handover
Tested and documented as agreed
Suitable orders
Typical orders where the technology is defined and manufacturing is outsourced.
Manufacturing to your documents
Control cabinets and assemblies built to approved customer documentation, without our own design.
Individual manufacturing steps
Only mechanical machining, only wiring or only cable assembly – individually or combined.
Complete assemblies
Assembled and wired units for integration into machines, systems or customers' own end products.
Additional manufacturing capacity
When the technology is defined and your own production is at full capacity.
Customer-supplied material
Manufacturing with your components, with procurement by Gross Schaltschrankbau or in a mixed model.
Recurring orders
Repeated manufacturing to the same approved status, on call-off.
Production workflow
Before starting, we check your documents for manufacturability and report any deviations. Manufacturing only begins on an unambiguous, approved status – tested and handed over according to the agreed criteria.
01
Reconcile revision, BOM, variants and approvals.
02
Procure, inspect and provide components.
03
Prepare mechanical parts and cables.
04
Populate, wire and label assemblies.
05
Check and document defined characteristics.
06
Pack and provide approved units.
Flexible scope of services
Quality
We report deviations between documents and manufacturing before they end up in the cabinet. The test scope is defined and recorded before manufacturing begins.
Change management
New revisions are assessed, approved and introduced at a defined point in time.
Clear lines of responsibility
Contract manufacturing works reliably when technical and commercial responsibilities are clearly documented before the start.
Delivery capability
Three factors determine whether a delivery date holds. They are clarified before manufacturing begins.
Procurement
Take approved components, alternatives and potential long-lead items into account at an early stage.
Demand planning
Agree forecast, call-off rhythm, safety stock and required delivery dates.
Packaging & Logistics
Frequently asked questions
Send us your documents, quantities and schedule. Gross Schaltschrankbau reviews the data, clarifies open points and agrees the appropriate manufacturing scope with you.