You can engage Gross Schaltschrankbau for individual work packages or for a coordinated overall process. The specific scope is defined on the basis of your documents, quantities, target markets and test requirements.
Service areas
The three areas build on one another but can be commissioned individually. Which project step makes sense depends on the maturity of your documents and the capacities available.
01
Turn technical requirements into reliable manufacturing documents and clearly defined milestones.
View Planning & Engineering →
02
Manufacture one-off units, assemblies and series reproducibly on the basis of approved documents.
Explore Manufacturing →
03
Verify agreed requirements, document results and prepare a traceable handover.
View Testing & Quality Assurance →
Project workflow
Every project follows the same sequence: clarify, define, approve, manufacture, test. The difference lies in the entry point – some projects start with an idea and a specification, others with fully approved schematics from your own design department.
The first two steps determine the cost of the last ones. Defining interfaces, target market and test requirements early avoids changes to systems that have already been built. A correction in the schematic takes minutes – the same correction on the wired system takes hours and creates additional testing effort.
Approval is the handover point between planning and manufacturing. From here on, the documented status is binding; later changes are handled as a traceable change process with their own approval. This protects both sides: you know what is being built, and we know what will be tested against at the end.
Not every project needs all five steps from us. If you bring approved documents, our cooperation starts with manufacturing. If the system has not yet been fully designed, we take over from requirements gathering. What matters is that the handover points are clearly defined.
01
Review documents, quantities, schedules and operating conditions.
02
Agree interfaces, target markets, components and verifications.
03
Approve schematics, bills of materials and changes in a traceable manner.
04
Machine, assemble, mount components and wire.
05
Document the agreed scope of testing and prepare delivery.
Standards & verifications
Which regulations apply in a specific project depends on the application, target market and the customer's plant standard. We clarify these points before production starts.
Basis for the design and construction of the switchgear assembly.
Verifications handed over with the system.
How traceability is ensured throughout the project.
Industries
We clarify operating conditions, plant standards and acceptance criteria on a project-specific basis.
Machine & Plant Engineering
Individual machines, assembly and conveyor systems.
Automotive & Suppliers
Production lines, test rigs, intralogistics.
Energy Supply
Low-voltage distribution boards and load management.
Food Industry
Process and filling systems with hygiene requirements.
Environmental Technology
Water, wastewater, recycling and exhaust air.
Packaging Industry
Packaging systems and filling equipment
Research & Development
Test rigs, laboratories and pilot plants.
Other industries
Your industry isn't listed? We clarify the requirements on a project basis.
Frequently asked questions
Send us your existing documents, quantities, schedule and any special requirements. We will check which services and which manufacturing model fit your situation.