Gross Schaltschrankbau wires power, control and signal circuits according to approved schematics and specifications. Clean cable routing, unambiguous marking and defined tests ensure a maintenance-friendly build.
Basis
Approved schematic
Circuits
Power, control and signals
Testing
Wiring check and measurements
Scope of services
Three wiring services and three typical starting points. Which of them apply to a project depends on the schematic, the target market and the test specification.
Power wiring
Supply, protective and load circuits as specified.
Control wiring
Connecting PLCs, relays, terminals and operator devices.
Signal and communication
Shielded cables and bus systems according to defined connection rules.
New control cabinets
Complete wiring according to the manufacturing documents.
Sub-assemblies
Pre-wired modules for final assembly.
Conversion and retrofit
Modifications based on the verified existing installation and the approved target design.
Process
Wiring is the step where the quality of the documentation becomes visible. A complete, up-to-date schematic can be implemented quickly; an incomplete one raises queries that put the schedule under pressure.
We work to the approved drawing, not to an interpretation of it. Cross-sections, colours, wire-end processing and the separation of circuit types follow the agreed specifications and the target market.
Every connection is marked and checked against the drawing. Anything that stands out – a missing device, an implausible terminal assignment – is reported back to engineering instead of being decided in the workshop.
01
Cross-check schematic, terminal diagram and revision status.
02
Cut to length, strip, crimp wire ferrules and mark.
03
Route cables cleanly and separate circuit types.
04
Terminate terminals and devices according to the connection rules.
05
Check the wiring and carry out the agreed measurements.
Required information
The more complete this information is, the more reliable the quotation, schedule and inspection scope will be. We clarify missing points before manufacturing starts.
Quality assurance
The test scope is defined before production starts and documented afterwards.
Industries
We clarify operating conditions, plant standards and acceptance criteria on a project-specific basis.
Machine & Plant Engineering
Individual machines, assembly and conveyor systems.
Automotive & Suppliers
Production lines, test rigs, intralogistics.
Energy Supply
Low-voltage distribution boards and load management.
Food Industry
Process and filling systems with hygiene requirements.
Environmental Technology
Water, wastewater, recycling and exhaust air.
Packaging Industry
Packaging systems and filling equipment
Research & Development
Test rigs, laboratories and pilot plants.
Other industries
Your industry isn't listed? We clarify the requirements on a project basis.
Frequently asked questions
Send us your documents, quantities and schedule. Gross Schaltschrankbau reviews the data, clarifies open points and agrees the appropriate manufacturing scope with you.